Coteca – CITB Test Revision FREE

[email protected]

0208 099 4324

8 AM to 6 PM (Mon to Fri)

8 AM to 6 PM (Mon to Fri)

CITB Plumbing Mock Test - 6

CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

If breaking up a cast iron bath, which of the following is the proper way to protect your hearing?

 
 
 
 

You are asked to join plastic soil pipes in the roof space of a building using a strong smelling hazardous solvent, but you have not been provided with any respiratory protective equipment. What should you do?

 
 
 
 

When working with fiberglass roof insulation, which of the following items of personal protective equipment should you work?

 
 
 
 

You have been handling sheet lead. How is some lead most likely to get into your bloodstream?

 
 
 
 

How should you dismantle a length of cast iron soil pipe at height?

 
 
 
 

If you are drilling a hole to receive a pipe from a radiator, when do you need to wear eye protection?

 
 
 
 

If you are carrying out hot works with a bow torch, how long after you finish can you leave the work area?

 
 
 
 

What should you do if you arrive at a job which involves using ladder access to the roof and noticed that the ladder has been painted?

 
 
 
 

Da what is the preferred method of checking for leaks when assembling LPG equipment before use?

 
 
 
 

What Should You Do When Using A Blowtorch Near To Timber? Give One Answer

 
 
 
 

While working, you come across a hard, white powdery material that could be asbestos. What should you do?

 
 
 
 

A plumbing permit is required for the replacement of which of the following?

 
 
 
 

Which One Of These Is True In Relation To The Safe Working Load (Swl) Of Lifting Equipment? Give One Answer

 
 
 
 

How should bottles be positioned when using oxyacetylene welding equipment ?

 
 
 
 

You Are Required To Take Up A Length Of Floorboard To Install Pipework. Which Of The Following Tools Should You Use? Give One Answer

 
 
 
 

You are removing guttering from a large, single Storey, metal framed and cladded building. The job is likely to take all day. What is the most appropriate type of access equipment you could use?

 
 
 
 

Where should a fire extinguisher be if you’re using a blowtorch to joint copper tube and fittings in a domestic property?

 
 
 
 

You are working in an occupied Building and have taken up 6 lengths of 3 m floor boarding when you are called away to an urgent job. what should you do?

 
 
 
 

What Is It Likely To Mean If The Soil Gives Off A Strange Smell When Digging? Give One Answer

 
 
 
 

Which one of the following items of PPE is designed to protect against infrared radiation damage to the eyes during flame cutting or welding?

 
 
 
 

Question 1 of 20

Success Stories!

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.