CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

1. Where should a fire extinguisher be located when using a blowtorch to join copper tubes in a domestic property?

 
 
 
 

2. How should oxyacetylene welding bottles be positioned during use?

 
 
 
 

3. What is the color of an acetylene cylinder?

 
 
 
 

4. After handling sheet lead, how is lead most likely to enter your bloodstream?

 
 
 
 

5. What is the most likely risk of injury when cutting a large-diameter pipe?

 
 
 
 

6. When is eye protection required if you are drilling a hole to install a pipe from a radiator?

 
 
 
 

7. Why is it important for operatives to know the difference between propane and butane equipment?

 
 
 
 

8. What is the proper method for installing a flue liner in an existing chimney?

 
 
 
 

9. Which item of PPE is specifically designed to protect against infrared radiation damage during flame cutting or welding?

 
 
 
 

10. Under what circumstances is it safe to transport workers in the rear of a van?

 
 
 
 

11. What should you do when using a blowtorch near timber?

 
 
 
 

12. Where is the safest place to store oxyacetylene gas welding bottles when they are not in use?

 
 
 
 

13. Where might asbestos commonly be found?

 
 
 
 

14. What action should you take if you notice that a ladder used for roof access has been painted?

 
 
 
 

15. What is the most appropriate access equipment to use when removing guttering from a large, single-story, metal-framed, cladded building for an all-day job?

 
 
 
 

16. What should you do if you are asked to join plastic soil pipes in a roof space using a strong-smelling hazardous solvent but have not been provided with respiratory protective equipment?

 
 
 
 

17. If you are called away urgently while working in an occupied building and have removed several floorboards, what steps should you take before leaving?

 
 
 
 

18. What is the correct method for dismantling a length of cast iron soil pipe at height?

 
 
 
 

19. Why is it necessary to carry out temporary continuity bonding before removing or replacing sections of metallic pipework?

 
 
 
 

20. Which of the following statements is correct?

 
 
 
 

Question 1 of 20

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.