Coteca – CITB Test Revision FREE

CITB Test - Practice 8

CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

Where must the number of people who may be carried in a passenger hoist on site be displayed ?

 
 
 
 

The beaufort scale is important when working at height externally. What does it measure ?

 
 
 
 

Electric welding is about to start on your site. What should be used to protect passers-by from getting arc eye?

 
 
 
 

In which regulations will you find the details of the welfare facilities that must be provided on a construction site?

 
 
 
 

What is the minimum height of the main guard rail on a scaffold ?

 
 
 
 

Which of the following is a significant hazard when excavating alongside a building or structure?

 
 
 
 

The heavy load has been delivered to the site. What is the first thing that should be considered before trying to move it?

 
 
 
 

Under the construction design and management regulations 2015, which two of the following must you ensure workers have received before they start working on site?

 
 
 
 
 

When should guard rails be fitted to a working platform ?

 
 
 
 

A design feature of some airbags used for full assist is a controlled leak rate. If you are using these, what must you ensure about the inflation pump?

 
 
 
 

Which of the following precautions should be taken to prevent a dumper that is tipping material into an excavation from falling into it?

 
 
 
 

On a scaffold, what must be the largest unprotected gap between any guardrail, toe board, barrier or other similar means of protection?

 
 
 
 

How long must you keep inspection records under the construction *design and management) regulations 2015?

 
 
 
 

Which of the following tasks would you expect the Appointed Person for first aid to carry out if someone is injured?

 
 
 
 

Before allowing a lift operation to be carried out, where should you ensure that the sequence of operations is recorded to enable a safe lift ?

 
 
 
 

If a scaffold is not complete, which of the following actions should be taken by the supervisor?

 
 
 
 

When the construction (design and management) regulations 2015 apply, what must be in place before construction work begins?

 
 
 
 

What should be the capacity of a spillage Bund around a fuel storage tank, in addition to the volume of the tank?

 
 
 
 

What danger is created by excessive oxygen in a confined space?

 
 
 
 

Which piece of equipment is used with a cable avoidance tool to detect cables?

 
 
 
 

Question 1 of 20

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.