Coteca – CITB Test Revision FREE

[email protected]

0208 099 4324

8 AM to 6 PM (Mon to Fri)

8 AM to 6 PM (Mon to Fri)

CITB Test - Practice 6

CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

What is your least reliable source of information when assessing the level of vibration from a power tool ?

 
 
 
 

How should cylinders containing LPG be stored on site ?

 
 
 
 

What should you do if you notice workers above a safety net are dropping off-cut materials and debris into the net ?

 
 
 
 

On the site electrical distribution system, which colour plug indicates a 400 volt supply ?

 
 
 
 

Where is the ideal place to rig a safety net ?

 
 
 
 

According to the Work at Height Regulations, a scaffold inspection report must be given ____ following an inspection.

 
 
 
 

If a worker tells you they have work-related hand-arm vibration syndrome (HAVS) it should be reported to______.

 
 
 
 

What THREE details must be included in a method statement for working at height? (Choose 3 answers)

 
 
 
 
 

The maximum vertical height a fixed ladder can be climbed before requiring an intermediate landing place is ___.

 
 
 
 

If a prohibition notice is issued by a Health and Safety Executive (HSE) inspector it means that______.

 
 
 
 

According to the Construction (Design and Management) Regulations 2015, which of these MUST be provided before construction work can start, and also maintained until the work finishes ?

 
 
 
 

Where can you obtain details regarding the welfare facilities that must be present on a construction site ?

 
 
 
 

What is the significance of a weekly or daily personal noise exposure of 87 decibels ?

 
 
 
 

Where should an emergency escape route lead ?

 
 
 
 

To check if a RCD connected to a power tool is working correctly you should :

 
 
 
 

When is it advisable to take precautions to prevent people, plant or materials falling into an excavation ?

 
 
 
 

What should a supervisor do if a scaffold is not complete ?

 
 
 
 

You need to use inflatable airbags to protect a small area, why is it dangerous to use airbags that are larger than the area that needs to be protected?

 
 
 
 

A permit to work system is used to ___.

 
 
 
 

How should access be handled when workers are working in a riser shaft ?

 
 
 
 

Question 1 of 20

Success Stories!

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.