CITB Test - Practice 12

CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

When planning possible work in a confined space, what should be the first consideration?

 
 
 
 

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

 
 
 
 

Under the current Construction (Design and Management) Regulations, what document must be handed to the client upon completion of the construction phase?

 
 
 
 

When should guard-rails be fitted to a working platform?

 
 
 
 

Following a scaffold inspection under the Work at Height Regulations, how soon must a report be given to the person on whose behalf the inspection was made?

 
 
 
 

Under the current Construction (Design and Management) Regulations, who must develop the pre-construction information into a construction phase plan?

 
 
 
 

When overhead electric cables cross a construction site, it is recommended that goal-post barriers should be erected parallel to the overhead cables at a distance not less than:

 
 
 
 

The monitoring and controlling of health and safety procedures can be either proactive or reactive. Proactive monitoring means:

 
 
 
 

A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, the inflation pump must:

 
 
 
 

A competent person must routinely inspect a working platform:

 
 
 
 

The significant findings of risk assessments must be recorded when more than a certain number of people are employed. How many?

 
 
 
 

Where a project is notifiable under the current Construction (Design and Management) Regulations, what must be in place before construction work begins?

 
 
 
 

The minimum level of first-aid cover required at any workplace is an appointed person. Which of the following would you expect the appointed person to carry out?

 
 
 
 

What does the term ‘lower exposure action value’ mean when referring to noise?

 
 
 
 

Ideally, a safety net should be rigged:

 
 
 
 

What is the best way for a supervisor or manager to make sure that the operatives doing a job have fully understood a method statement?

 
 
 
 

A RCD (residual current device) must be used in conjunction with 230 volt electrical equipment because it:

 
 
 
 

How could a site worker check if the RCD (residual current device) through which a 230 volt hand tool is connected to the supply is working correctly?

 
 
 
 

The current Construction (Design and Management) Regulations require a supported excavation to be inspected:

 
 
 
 

When setting up a fuel storage tank on site, a spillage bund must have a minimum capacity of the contents of the tank, plus:

 
 
 
 

Question 1 of 20

Success Stories!

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.