Practice Test - Set 20

Managers CITB Test

CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

Your workers have been face-fit tested. What is one of the checks you can make to ensure their mask provides a tight seal?

 
 
 
 

If you find bats on site, which of the following statements is true?

 
 
 
 

What two main areas of visual inspection should be carried out before each use of a power tool?

 
 
 
 
 

Hearing protection zones should be mandatory at what decibel dB(A) level?

 
 
 
 

What is the first thing you should do if you are in a deep trench and you start to feel dizzy?

 
 
 
 

If you are not trained in first aid, and someone is knocked unconscious, what should you do first?

 
 
 
 

When assessing the competence of a demolition contractor, which approach is most advisable?

 
 
 
 

From a safety point of view, which of the following should be considered first when deciding on the number and location of access and egress points to a site?

 
 
 
 

When must you wear hi-vis (high-visibility) clothing?

 
 
 
 

What must contractors ensure when work is taking place in a corridor that is a fire escape route?

 
 
 
 

A mobile elevating work platform (MEWP) is being used to carry out work at height. What is the only circumstance, in normal use, in which it is acceptable to lower the platform using the ground-level controls?

 
 
 
 

On visiting a site you noticed that it is next to a primary school. what is likely to be the most effective way of keeping children off construction sites?

 
 
 
 

What should you do if a worker needs to wear ear defenders but an ear pad is missing from one of the shells?

 
 
 
 

When planning work on an electrical system, what is the best way to ensure a circuit remains isolated?

 
 
 
 

Why is it important for all workers to attend site induction?

 
 
 
 

Which two of the following factors must be considered when providing first-aid facilities on site?

 
 
 
 
 

Why do most electrical accidents occur? Identify two reasons.

 
 
 
 
 

A supervisor has been working long hours and their quality of work and attention to detail is decreasing. What health condition could they be showing signs of?

 
 
 
 

If employees have to work outdoors in bad weather, why should you supply them with waterproof clothing?

 
 
 
 

What is the main reason why temporary highways signing needs to be removed when works are completed?

 
 
 
 

Question 1 of 20

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.