Coteca – CITB Test Revision FREE

coteca.co.uk > CITB Revision Testing > CITB Test > Managers or MAP Test

Practice Test - Set 15

Managers CITB Test

CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

To ensure your safety and that of the site workers, what should a contractor include in a safety method statement for working at height? Give Two answers.

 
 
 
 
 

What must edge protection be designed to do?

 
 
 
 

Which two of the following documents refer to the specific hazards associated with demolition work in confined spaces?

 
 
 
 
 

Which two of these activities are likely to need a hot-work permit?

 
 
 
 
 

If your doctor says that you contracted Weil’s disease on-site, why do you need to tell the employer?

 
 
 
 

Which of the following can provide a good first impression of how well a site is being run?

 
 
 
 

What action could employees take if they feel a construction company has discriminated against them at work?

 
 
 
 

What does this sign mean?

Not drinkable.jpg

 
 
 
 

What is the purpose of using a permit to work system?

 
 
 
 

What action should be taken before using a scaffold which is secured by masonry anchor ties?

 
 
 
 

A foam extinguisher, identified by a cream band, should not be used on what type of fire?

 
 
 
 

What two precautions should be taken to reduce the risk of water pollution when mixing concrete and cement on site?

 
 
 
 
 

You need to walk past someone using a mobile crane. What should you do?

 
 
 
 

Which of these tools is most likely to cause vibration white finger?

 
 
 
 

If someone has to move a load while they are sitting down, how much can they move safely?

 
 
 
 

An outdoor tower scaffold has stood overnight in high winds and heavy rain. What should you ensure before the scaffold is used?

 
 
 
 

What are yellow and black signs?

 
 
 
 

Under the Construction (Design and Management) Regulations 2015, who must the principal designer pass the health and safety file to on completion of the construction project?

 
 
 
 

What should be the first consideration of the contractor’s responsible person before planning for anyone to enter a confined space?

 
 
 
 

What item of personal protective equipment (PPE), from the following list, should be used when oxyacetylene welding?

 
 
 
 

Question 1 of 20

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.