Coteca – CITB Test Revision FREE

coteca.co.uk > CITB Revision Testing > CITB Test > Managers or MAP Test

Practice Test - Set 14

Managers CITB Test

CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

What does this sign mean?

Do not touch.jpg

 
 
 
 

When working after dark, is mobile plant exempt from the requirement to show lights?

 
 
 
 

Can the damage by exposure to noise over a long period of time be reversed?

 
 
 
 

When must employers supply personal protective equipment (PPE)?

 
 
 
 

If work is being planned that will create dust, what action should be taken?

 
 
 
 

Who has the legal duty to ensure that workers are provided with any personal protective equipment (PPE) they need, including the means to maintain it?

 
 
 
 

A scaffold guard-rail must be removed to allow a worker to carry out a task. If the worker is not a scaffolder, can they remove the guard-rail?

 
 
 
 

What does it mean if you see frost around the valve on a liquefied petroleum gas (LPG) cylinder?

 
 
 
 

What final element is missing from this simple four point pollution incident response plan? Stop – Contain – Notify – ?

 
 
 
 

What must happen each time before a shift starts work in an excavation?

 
 
 
 

What is the first question to ask if work may need to be carried out in a confined space?

 
 
 
 

What does wearing hearing protection do?

 
 
 
 

What is the main danger of leaving someone who has fallen suspended in a harness for too long?

 
 
 
 

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

 
 
 
 

What is the legal duty of the site manager when an invasive species of plant, such as Japanese knotweed, is discovered on site?

 
 
 
 

How would you expect the topics for toolbox talks to be selected ?

 
 
 
 

You are in charge of a gang of workers who are about to start on a new site. What can you do to help minimise manual handling?

 
 
 
 

Under the Construction (Design and Management) Regulations 2015, in which of the following situations would a principal contractor need to focus on good contractor co-operation?

 
 
 
 

Under the Construction (Design and Management) Regulations 2015, what, in addition to applying the general principles of prevention, must a designer take into account when preparing a design?

 
 
 
 

Which two of the following should be undertaken to help improve a pollution incident response?

 
 
 
 
 

Question 1 of 20

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.