CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

Can the damage by exposure to noise over a long period of time be reversed?

 
 
 
 

What must happen each time before a shift starts work in an excavation?

 
 
 
 

Which two of the following should be undertaken to help improve a pollution incident response?

 
 
 
 
 

Who has the legal duty to ensure that workers are provided with any personal protective equipment (PPE) they need, including the means to maintain it?

 
 
 
 

You are in charge of a gang of workers who are about to start on a new site. What can you do to help minimise manual handling?

 
 
 
 

A scaffold guard-rail must be removed to allow a worker to carry out a task. If the worker is not a scaffolder, can they remove the guard-rail?

 
 
 
 

When must employers supply personal protective equipment (PPE)?

 
 
 
 

Under the Construction (Design and Management) Regulations 2015, what, in addition to applying the general principles of prevention, must a designer take into account when preparing a design?

 
 
 
 

How should cylinders containing liquefied petroleum gas (LPG) be stored on site?

 
 
 
 

What does it mean if you see frost around the valve on a liquefied petroleum gas (LPG) cylinder?

 
 
 
 

What does wearing hearing protection do?

 
 
 
 

When working after dark, is mobile plant exempt from the requirement to show lights?

 
 
 
 

Under the Construction (Design and Management) Regulations 2015, in which of the following situations would a principal contractor need to focus on good contractor co-operation?

 
 
 
 

What does this sign mean?

Do not touch.jpg

 
 
 
 

What final element is missing from this simple four point pollution incident response plan? Stop – Contain – Notify – ?

 
 
 
 

If work is being planned that will create dust, what action should be taken?

 
 
 
 

What is the legal duty of the site manager when an invasive species of plant, such as Japanese knotweed, is discovered on site?

 
 
 
 

What is the main danger of leaving someone who has fallen suspended in a harness for too long?

 
 
 
 

How would you expect the topics for toolbox talks to be selected ?

 
 
 
 

What is the first question to ask if work may need to be carried out in a confined space?

 
 
 
 

Question 1 of 20

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.