CITB test is a test which is used to assess the occupational competency of individuals working in the construction site. It is a multiplechoice question & answer exam. The questions cover topics such as safety, health and environment, construction site procedures and materials. Passing the CITB test is a must requirement for CSCS Card.  Start practicing for your CITB Test today!

Under the current Construction (Design and Management) Regulations, what document must be handed to the client upon completion of the construction phase?

 
 
 
 

Ideally, a safety net should be rigged:

 
 
 
 

When should guard-rails be fitted to a working platform?

 
 
 
 

A design feature of some airbags used for fall arrest is a controlled leak rate. If you are using these, the inflation pump must:

 
 
 
 

What does the term ‘lower exposure action value’ mean when referring to noise?

 
 
 
 

The monitoring and controlling of health and safety procedures can be either proactive or reactive. Proactive monitoring means:

 
 
 
 

A competent person must routinely inspect a working platform:

 
 
 
 

The current Construction (Design and Management) Regulations require a supported excavation to be inspected:

 
 
 
 

When setting up a fuel storage tank on site, a spillage bund must have a minimum capacity of the contents of the tank, plus:

 
 
 
 

The significant findings of risk assessments must be recorded when more than a certain number of people are employed. How many?

 
 
 
 

Under the current Construction (Design and Management) Regulations, who must develop the pre-construction information into a construction phase plan?

 
 
 
 

The minimum level of first-aid cover required at any workplace is an appointed person. Which of the following would you expect the appointed person to carry out?

 
 
 
 

Following a scaffold inspection under the Work at Height Regulations, how soon must a report be given to the person on whose behalf the inspection was made?

 
 
 
 

Where should liquefied petroleum gas (LPG) cylinders be positioned when supplying an appliance in a site cabin?

 
 
 
 

When overhead electric cables cross a construction site, it is recommended that goal-post barriers should be erected parallel to the overhead cables at a distance not less than:

 
 
 
 

When planning possible work in a confined space, what should be the first consideration?

 
 
 
 

How could a site worker check if the RCD (residual current device) through which a 230 volt hand tool is connected to the supply is working correctly?

 
 
 
 

A RCD (residual current device) must be used in conjunction with 230 volt electrical equipment because it:

 
 
 
 

Where a project is notifiable under the current Construction (Design and Management) Regulations, what must be in place before construction work begins?

 
 
 
 

What is the best way for a supervisor or manager to make sure that the operatives doing a job have fully understood a method statement?

 
 
 
 

Question 1 of 20

Don’t get confused! Just Fill your details & get quick support for your CSCS Card.

Get on site with right CSCS Card!

Fill in a few details to get started with the application. The process is simple and takes only a few minutes.